Skip to main content

Cement Silo

Cement Silo Discharge Blockage

Possible causes

  1. 1

    Moisture Absorption and Cement Hardening:Moisture entering the silo through damaged seals, open inspection covers or humid air can cause cement to absorb water and form hardened lumps. These deposits may accumulate near the hopper and restrict normal material discharge.

  2. 2

    Cement Bridging Inside the Silo:Stored cement may form an arch above the discharge outlet, preventing the material from flowing downward. This condition is more likely when cement has been stored for a long time or its flow characteristics have changed.

  3. 3

    Blocked or Damaged Aeration Pads:Aeration pads help loosen cement near the bottom of the silo. When the pads become clogged, damaged or unevenly supplied with compressed air, the material may not flow smoothly toward the discharge opening.

  4. 4

    Discharge Valve Malfunction:A damaged butterfly valve, worn sealing components or insufficient actuator pressure may prevent the discharge valve from opening completely, reducing the amount of cement entering the conveying system.

Check & fix

1. Inspect the Silo Sealing System

Check the silo roof, inspection covers, inlet connections and sealing components for moisture penetration. Replace damaged seals and keep all access openings properly closed to prevent cement from absorbing moisture.

2. Check for Cement Bridging

Observe the material discharge condition and inspect the hopper's external flow indicators where available. Use the manufacturer's approved aeration or discharge assistance system to restore material flow without entering the silo.

3. Inspect the Aeration System

Check compressed air supply, distribution pipes, valves and aeration pads for blockages or leakage. Clean or replace damaged components and restore the specified air supply according to the equipment design.

4. Examine the Discharge Valve

Inspect the butterfly valve, actuator and sealing surfaces for accumulated cement or mechanical damage. Clean the valve components, repair air supply problems and replace worn seals when necessary.

Quick Contact

Send us your project details

Tell us your required capacity, site conditions and project schedule — we will design the plant layout and issue a free site plan for your confirmation.

captcha

Or directly

Subscribe for Updates

Leave your name and e-mail to receive Yuzhixin product and project updates.